Marker wind park, Ørje, Norway

  • Typ objektu:
  • Stavby pre energetický priemyseľ
Celá obrazovka Zatvor

Peikko Group’s Norwegian subsidiary Peikko Norge AS delivers Rock Anchor Foundation Technology to 15 wind turbines at Marker wind park, located in the Ørje area of south-east Norway.

 

The deliveries compriseds of FATBAR® rock anchors, tower adapter plates with tower flange connection bolts, drilling templates- and assembling system, special reinforcement steel technology. Peikko are also responsible for the foundation design and structural calculations. Deliveries scheduled to take place between April –  August 2018.

The project development of the wind farm is carried out by Scanergy AS, and the realization of the project will be done in cooperation with the investor, a Swiss utility known as BKW Energie AG. Local project management during the construction phase will be handled by Proxima Scandinavia AS, a joint venture established between BKW Energie AB and Norwegian company Captiva Asset Management AS.

The heavy machinery contractor Bergquist Maskin og Transport AS, is responsible of the civil earthworks and infrastructure. Their subcontractor Askim Entreprenør AS, will carry out the technical assembly of steel components and casting works of the Peikko Rock Anchored Foundations. Vestas to deliver 15 of their  V136-3.6MW turbines, with a hub height of 142 meters. The wind park schedueld to be opreational by the end of 2018.

Čítajte viac down-arrow.png

Peikko’s rock-anchored foundations reduce the need for concrete by more than 90%. Traditional gravity foundations for wind turbines require approximately 600 m³ of in-situ concrete. Now, the necessary amount of concrete is less than 50m³, which is both cost-effective and environmentally friendly. This has been one of the crucial criteria in our project

Sebastian Prause, the Construction Manager of Scanergy.

Informácie o projekte

Developer:
Scanergy AS
Stavebná spoločnosť:
Bergquist Maskin og Transport AS / Askim Entreprenør AS
Statik:
Peikko is also responsible for the structural calculations associated to the design of the Rock Anchor Foundations
Rok dodania produktov:
2018
Rok ukončenenia výstavby:
2018
Počet turbín:
15
Výrobca turbíny:
Vestas
Veľkosť trubíny, MW:
V136-3.6MW
Výška veternej turbíny:
142

Kontakty