HMP Oakwood, Staffordshire, UK

  • Typ objektu:
  • Iné verejné budovy
Celá obrazovka Zatvor Street View

DELTABEAM® and precast connections used to achieve demanding programme, reduce wet trades and increase quality and build efficiency – ultimately producing a robust and durable structure to meet client’s specification that required flat soffit.

To meet a challenging design, manufacture and construction programme involving some 13,000 precast concrete elements, required close co-operation of design and procurement within supply chain.

The project involved the construction of 12 precast concrete buildings, including three 480 place four-storey houseblocks, entry buildings, a hospital, an isolation unit, first night facilities and associated buildings, all within a demanding timeframe of just one calendar year.

The precast elements have a number of features designed to limit site work to a minimum and speed up construction. All doors, window grilles and window units were built in at manufacture, along with balustrades, sanitary provisions and drainage. M&E provision was also cast into the units at manufacture, along with other features designed to directly interface with 12 metre service cores installed in all three of the four-storey houseblocks.

  • 53 week precast build programme, contract value £35 million
  • £180 million project, £35 million precast structures. 12 buildings / 13,500 precast concrete units
  • 3,500 panel types
  • 60-week production programme / 300 units weekly at peak
Čítajte viac down-arrow.png

Informácie o projekte

Developer:
Kier Construction
Stavebná spoločnosť:
PCE Ltd
Statik:
PCE Ltd
Rok dodania produktov:
2009
Rok ukončenenia výstavby:
2011

Kontakty